CLOSURE EXTENDED (RE-OPENING TO BE DETERMINED)

CLOSURE EXTENDED (RE-OPENING TO BE DETERMINED)

(Pictured is some of the spalling brick repaired from the men’s locker room.) The Mount Rainier Pool will be extending our closure from September 3 through T.B.D. to complete warranty work from our previous closure. These items must to be completed within the...